AECOM: Data Center Construction Scheduler — Buffalo, NY, United States

AECOM lists a Data Center Construction Scheduler opening in Buffalo, NY, United States. The position is listed as full-time. The job description covers maintenance, procurement, communication.

Recruitment overview

OrganisationAECOM
Post / roleData Center Construction Scheduler
Employment typeFull-time
Notification / job IDJ10162801
Job locationBuffalo, NY, United States
Work arrangementOn-site
Educational qualificationSee the employer’s role-specific qualification criteria
Experience requiredBA/BS plus six years of experience or demonstrated equivalency of experience and/or education
Salary / stipendSee employer notice for pay details
Last date to applySee official notice

About AECOM

AECOM is an infrastructure consulting business whose employer material describes work involving transport, energy, water and the built environment. Its activities bring together planning, design, engineering, scientific work, and programme or construction management. The organisation's described projects concern the physical systems used by communities, from travel and utilities to buildings. Those activities connect technical disciplines with project delivery, supported by digital and business functions around the planning, development and management of infrastructure.

The position and its setting

AECOM lists Data Center Construction Scheduler in Buffalo, NY, United States, under reference J10162801. The details below separate the work described by the employer from essential conditions, preferred experience and practical preparation advice.

  • Employment type: Full-time
  • Employer listing date: 24 October 2026
  • Legal Entity: AECOM Technical Services Inc
  • Job Family: Project Controls
  • Brands: AECOM

Responsibilities and work described

  • AECOM is currently seeking a detail-oriented and results-driven Construction Project Scheduler to join our Program Management team in Buffalo, NY
  • The ideal candidate will be technically proficient in Primavera P6, possess communication skills, and have the ability to manage and convey complex scheduling information effectively across diverse project teams
  • Responsibilities included but not limited to:
  • On-site construction field experience as a scheduler
  • Knowledgeable of planning and scheduling concepts and principles
  • Supports analysis of schedule, identifies and investigates project schedule variances
  • Collects and updates data and updates and produces scheduling reports
  • Assists in the development and maintenance of WBS and support activities to implement applicable coding
  • Supports basic schedule development
  • Supports gathering and assembling data for schedule updating
  • Supports measurement of project schedule progress and gathers and assembles data for schedule and network updating
  • Gathers data for schedule baseline development and maintenance
  • Understands CPM scheduling concepts and principles and able to develop basic engineering, procurement and construction logic
  • Understands concepts and principles of scope control and change management and earned value methodology
  • Supports monthly report preparation
  • May participate in planning and scheduling meetings to gain insight to planning and scheduling issues

Essential requirements and candidate background

  • Experience: Data Center and/or Mission Critical construction projects
  • Familiar with data sources and supports basic schedule development
  • Familiar with construction drawings, specifications and construction contracting methods
  • BA/BS plus six years of experience or demonstrated equivalency of experience and/or education

Preferred experience and additional strengths

  • MS in Construction Management, Architecture or Civil or related field
  • Previous experience as an owner’s representative
  • At least four (4) years or more of construction, including field experience
  • Knowledge: transportation and general building related scopes of work
  • Experience: developing cost estimates in UNIFORMAT and CSI formats
  • Experience: developing and reviewing construction schedules in Primavera P6 and Microsoft Projects

Location, schedule and contract conditions

For this overseas or regional listing, confirm work authorisation and any location restrictions with the employer. The location does not establish visa sponsorship or permission to work remotely from India.

  • Work arrangement: On-site
  • Advertised location: Buffalo, NY, United States

Pay and application dates

A verified salary figure is not established in this article. An online estimate for another Data Center Construction Scheduler vacancy is not an offer for reference J10162801; use the employer’s own pay disclosure and recruitment communication.

A closing date is not confirmed in this article. Check the current employer page before submitting: an undated posting can change or be withdrawn.

How to apply to AECOM

Applications follow the official employer page linked below.

Open the official AECOM posting below and match the title and reference J10162801.

Compare your qualifications and experience with the essential conditions for the Buffalo, NY, United States position, then read the preferred criteria separately.

Prepare an accurate CV and the supporting items requested in that employer’s application. Provide only information and documents you are authorised to share.

Use the employer’s application option, complete the required fields and review the submission. Retain the acknowledgement when one is provided. Job Alerts World does not receive the application.

Practical preparation: maintenance

A maintenance example should identify the asset, the fault or preventive task and the action you performed. Explain the checks, records and handover involved in returning equipment or a service to use.

Relevant skills

  • maintenance
  • procurement
  • communication
  • cost estimation

Important links

Official notification / job descriptionOpen official page
Online application portalOpen official page

Read the complete official notice before applying. Availability and requirements can change.

For corrections, see our editorial policy and contact information.